Chockfast® Orange is a specially formulated 100% solids, two component inert filling casting compound developed for use as a chocking or grouting material. Chockfast is designed to withstand severe marine and industrial environments involving a high degree of both physical and thermal shock.

What is Chockfast used for?

CHOCKFAST is an engineered epoxy chocking material that is used to cast-in-place permanent machinery supports for all sizes and types of main engines and marine auxiliary equipment.

What is Chockfast made of?

Chockfast is a registered trademark of the epoxy resin made by ITW Philadelphia Resins Corp. The resin itself can be used in an infinite number of applications but it was developed especially for the chocking of marine diesel engines.

How do you pour Chockfast?

IV. MIXING AND POURING
  1. Ensure that all damming is complete.
  2. For CHOCKFAST ORANGE only, decide from the graph the amount of hardener to be used.
  3. Bring the resin and hardener from storage.
  4. Put on gloves and eye protection.
  5. Add the hardener to the resin can.
  6. Pour the resin as soon as possible after mixing.

What is Chockfast orange? – Related Questions

What is choke fasting?

CHOCK FAST: Chock fast is an epoxy material that is used to cast-in-place. It is used to fill the gap between the equipment and steel foundation. Chock fast is used around the hold-down bolts. There are two types of chock fasts: 1) Orange and 2) Grey.

How do you prepare to pour epoxy?

Before applying epoxy, sand smooth non-porous surfaces—thoroughly abrade the surface. 80-grit aluminum oxide paper will provide a good texture for the epoxy to “key” into. Be sure the surface to be bonded is solid. Remove any flaking, chalking, blistering, or old coating before sanding.

Should you let epoxy sit before pouring?

Layering in molds – allow each layer to set up for at least 3 hours before pouring next layer. Doming – you can apply your resin right after the 5 minute rest period, or let the resin thicken for up to 25-30 minutes.

What happens if you pour epoxy too thick?

If your epoxy pour is too thick, the reaction can create too much heat, resulting in a product that does not cure properly with cracks or excessive bubbles. You can pour the next layer after the previous pour has gone through its heat cycle, which is usually around 24 hours.

Will epoxy stick to epoxy without sanding?

Since the epoxy has cured a chemical bond is not possible so what is called a mechanical bond is needed. This simply means that the cured epoxy has to be lightly sanded before the next coat is applied: the first coat should have a matt, almost white, surface.

What do you put under epoxy pour?

Prior to mixing and pouring, you’ll need to prepare the surface you’ll be pouring onto. This is called your substrate, and the epoxy will attempt to form a chemical bond with it once makes contact. It’s important to make sure that your substrate is completely dry and clean.

What do you put under epoxy?

Sheathing or Painters Tape

Because Epoxy Resin does not stick to the tape, sheathing is the ideal material to use. Once you have made your product and the resin has fully cured, you can easily just remove the tape.

What are 3 important tips when pouring resin?

Tips for Working with Resin
  • Just Start! It’s not as intimidating as you think!
  • Read the Instructions.
  • Resin Takes a Long Time to Cure.
  • Work in a Well Ventilated Area.
  • Temperature Matters:
  • Avoid Pouring Resin When It’s Raining.
  • Always Protect your Work Surface.
  • Don’t Keep Food/Water on your Work Surface.

Do you have to sand a cup before epoxy?

But before doing so, it’s a good idea to sand the area where you’re going to work with a fine 220-grit sandpaper. This will scuff up the epoxy a little bit, which is scary at first. But don’t worry! You’ll get that shine back soon.

Does epoxy need 2 coats?

Whatever the project you’re working on, you’ll need several coats of epoxy resin and hardener. Most projects need between two and four. However many coats you’re planning on, you need to recoat at the right time and in the right way and ensure your surface is properly prepared.

How long do I have to wait between coats of epoxy?

There are two methods for applying additional epoxy resin coats: 1) sanding down your first layer after having let it dry for 24 hrs or, if you’re in a hurry, 2) you can pour a new resin layer every 3-5 hrs. Either of these methods work very well, allowing for a very strong bond between resin layers.

How many coats of epoxy should I use?

Apply a minimum of two coats of WEST SYSTEM epoxy for an effective moisture barrier. Apply three coats if sanding is to be done. Moisture protection will increase with additional coats, up to six coats or about a 20-mil thickness. Additives or pigments should not be added to the first coat.

Can you pour epoxy 2 inches thick?

Resin can be poured up to 2” thick per pour, and up to 4” depending on the volume of the pour. Step 5: Use a heat source such as a heat gun to remove any bubbles by adding a small amount of heat to the surrounding area.

Can epoxy be done in one day?

Our concrete coatings can be installed in just one day and are fully cured within 24 hours. Typical epoxy coatings need at least three to five days. Our manufacturer-certified professionals always perform at a high standard, complying with the manufacturer specifications and ensuring a job well done.